刘惠娟, 王颖明, 苏力. 发电机出口PT匝间短路故障分析[J]. 发电技术, 2018,39(5):462-465.
Huijuan LIU, Yingming WANG, Li SU. Analysis of PT Interturn Short Circuit Fault in a Generator Outlet[J]. Power Generation Technology, 2018, 39(5): 462-465.
刘惠娟, 王颖明, 苏力. 发电机出口PT匝间短路故障分析[J]. 发电技术, 2018,39(5):462-465. DOI: 10.12096/j.2096-4528.pgt.2018.071.
Huijuan LIU, Yingming WANG, Li SU. Analysis of PT Interturn Short Circuit Fault in a Generator Outlet[J]. Power Generation Technology, 2018, 39(5): 462-465. DOI: 10.12096/j.2096-4528.pgt.2018.071.
某电厂发变组保护A、B柜分别报"定子零序电压高段保护动作",引起机组跳闸。检查该发电机发变组保护动作、故障录波器均正常,现场发现发电机出口电压互感器(potential transformer,PT)B相5042PT有明显过热。通过分析事故经过,对故障PT完成直阻、绝缘、励磁特性曲线、空载电流测试等试验,确认发电机PT匝间短路是造成此次机组跳闸的主要原因。针对如何提前发现发电机出口PT绝缘裂化故障提出了相应的防范措施,应严格按预试规范要求完成发电机出口PT的局放、3倍频耐压等试验,并对各项常规预试项目数据进行趋势分析,及时发现异常。通过此次发电机出口PT匝间短路故障分析对及时发现设备安全隐患,提高设备运行可靠性起到较好排查作用。定期按规范要求完成相关试验,重视试验数据的趋势分析能有效降低同类型事故发生概率及减小事故范围。
Cabinet A and cabinet B of generator protection group of a power plant respectively reported "protection action of stator zero sequence high voltage section"
which caused unit trip. It was found that the generator outlet potential transformer(PT) B phase 5042PT was obviously overheated. The accident process
through the breakdown PT finish straight resistance
insulation
excitation characteristic curve
and no-load current test
PT interturn short circuit are the main reasons of the unit tripping. In view of how to find early export PT insulation fault
the corresponding measures to prevent cracking was proposed. Specification requirements must be strictly according to the forecast to complete generator export PT partial discharge
triple frequency withstand voltage test
etc. In addition
the trend analysis was carried out on the data of various routine pre-test projects to detect the abnormality timely. The analysis of PT turn-to-turn short circuit fault at the generator outlet plays a good role in finding out the safety hidden danger and improving the reliability of the equipment. The regular completion of relevant tests in accordance with the standard requirements and the emphasis on the trend analysis of test data can effectively reduce the occurrence probability of the same type of accidents and reduce the scope of accidents.
GB 50150-2016.电气装置安装工程.电气设备交接试验标准[S].北京: 中国计划出版社, 2016:
DL/T 596-1996.电力设备预防性试验规程[S].北京: 中国电力出版社, 1996:
刘宝华, 杨洪亮, 王福才.发电机出口PT匝间短路故障分析[J].电站系统工程, 2013, 29(6):53-54.
胡越冬.发电机出口电压互感器(PT)匝间短路故障分析[J].贵州电力技术, 2016, 19(5):49-53.
杜宁宁, 胡婷婷.发电机机端PT故障案例分析[J].山东电力技术, 2015, 42(3):73-74.
吴利平, 曾万德, 徐德荣, 等.某厂发电机定子接地保护动作跳机情况分析[J].江西电力, 2011, 35(4):56-58.
南东亮, 孙谊媊, 冯小萍, 等.一起由PT故障引起基波定子接地保护动作的分析[J].智能电网, 2016, 4(5):458-462.
郭晓锋.国产300~1000MW发电机出口PT试验方法介绍[J].河南电力技术, 2017(3):11-13.
林德泉, 涂小涛.某电厂发电机出口电压互感器故障分析及解体过程记录[J].南方农机, 2017(10):41-45.
戴寿超.发电机出口PT接地故障分析余处理[J].湖南理工学院学报(自然科学版), 2014, 27(4):63-67.